Starting Extension to Layout
avatar

Starting to work on the small extension to my layout. It will form the ‘foot’ of an L-shaped layout. The extension is small .. only adding about 20″ x 72″ .. the bit of the leg that extends past the original is only 44″ long. Still .. should provide room for a ‘town’ .. a small dock etc.

I kept putting it off .. I would wander over and go .. “hmmm .. need to ..” and the realize that I needed some switches and put it off with “.. I need to order switches” .. and then would forget.

The other day I finally ordered a couple of Peco switches .. and when they came in and I was arranging them on the extension I realized that I had miscounted .. and needed a couple of pieces of flex track .. which led to a .. “Arrrgghhhh”.

Man. If I only had a brain …

This entry was posted in Blogs, Model Railroad by etraxx. Bookmark the permalink.

About etraxx

Retired from the Army in 2006. Served during Vietnam - 1969-1972 as as 72B - Communications Center Specialist (Teletype Operator). Got out .. and went back in 1987 as a 19K - Armor Vehicle Crewman - (M1/M1A1 tanker) getting out in Korea in 1999. Went into the Reserves .. got mobilized in 2001 .. stayed active until my retirement with 20 years in 2006.

Comments

Starting Extension to Layout — 4 Comments

    • I could. I also have some O scale narrow gauge switch ties that I could cut up and put under the HO track. Something to think about. In the meantime .. I can get the switches down and worry about the extra track later.

Leave a Reply

Your email address will not be published. Required fields are marked *

I'm not a spammer This plugin created by Alexei91

Heads up! You are attempting to upload an invalid image. If saved, this image will not display with your comment.