Extension – minor progress
avatar

I have the foam shaped to work as the roadbed and cut away the bit that will be the location of a pier. Still very early. The plan is to cut down the fascia you see in the ‘finished’ bit here to just above the water level. That way I can show the banks of the river without having to model the ‘connecting’ water .. think that might be a problem where the new epoxy joins the old. That’s still ‘up in the air’ for now. I’m considering that corner .. a metal corner brace would make sense and then I could round off that corner instead of the right angle it is now. If I do that I will have to modify the banks and water of course. It would certainly look better IMO.

This entry was posted in Uncategorized by etraxx. Bookmark the permalink.

About etraxx

Retired from the Army in 2006. Served during Vietnam - 1969-1972 as as 72B - Communications Center Specialist (Teletype Operator). Got out .. and went back in 1987 as a 19K - Armor Vehicle Crewman - (M1/M1A1 tanker) getting out in Korea in 1999. Went into the Reserves .. got mobilized in 2001 .. stayed active until my retirement with 20 years in 2006.

Comments

Extension – minor progress — 3 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

I'm not a spammer This plugin created by Alexei91

Heads up! You are attempting to upload an invalid image. If saved, this image will not display with your comment.