Stuff To Do

To Do List
  • Complete Backwoods Water TankStatus: 90% complete.
  • Complete TurntableStatus: 90% complete.
  • On18 TrestleStatus: Just stated. Working on the sub-structure for the abutments.
  • larry track
  • Mine Run Coal Bin
  • Cleaned Coal Tipple
  • WasheryStatus: Plans are mostly done.
  • Coal CrusherStatus: Just the frame has been done.
  • Second Vehicular Bridge
  • Install MRC Prodigy DCC Cab Holsters
  • Install MRC Prodigy Extension Box
  • Turbine for Power StationStatus: The turbine body has been 3D printed. Need to add all of the bolts, rivets and assemble the thing.
  • Stairs for the HVCC Maint Shed
  • On30 IMA Hopper Kit

Comments

Stuff To Do — 2 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

I'm not a spammer This plugin created by Alexei91

Heads up! You are attempting to upload an invalid image. If saved, this image will not display with your comment.